quality-control/Assets/Prefabs
2024-08-18 17:48:35 +02:00
..
Construction Added more prefabs 2024-08-17 20:38:25 +02:00
Conveyor Assembling Main scene. 2024-08-18 17:48:35 +02:00
Products Assembling Main scene. 2024-08-18 17:48:35 +02:00
Tools Assembling Main scene. 2024-08-18 17:48:35 +02:00
Construction.meta Imported catwalk models 2024-08-17 19:08:50 +02:00
Conveyor Segment.prefab Prototyped the object production scheduling. 2024-08-17 15:12:00 +02:00
Conveyor Segment.prefab.meta Prototyped the object production scheduling. 2024-08-17 15:12:00 +02:00
conveyor_test.prefab Conveyor belt scrolling texture 2024-08-17 11:34:12 +02:00
conveyor_test.prefab.meta Conveyor belt scrolling texture 2024-08-17 11:34:12 +02:00
Conveyor.meta Assembling Main scene. 2024-08-18 17:48:35 +02:00
crate_test.prefab Added interaction, hand, rigidbody dragging, picking up hammer 2024-08-18 13:21:38 +02:00
crate_test.prefab.meta Test crates 2024-08-17 11:41:41 +02:00
Defect Detector.prefab Assembling Main scene. 2024-08-18 17:48:35 +02:00
Defect Detector.prefab.meta Added defect detector prefab. 2024-08-17 21:07:25 +02:00
flap_door.physicMaterial Strip doors 2024-08-18 12:31:25 +02:00
flap_door.physicMaterial.meta Strip doors 2024-08-18 12:31:25 +02:00
Products.meta Prototyped the object production scheduling. 2024-08-17 15:12:00 +02:00
sliding_crane.prefab Magnet no longer sticking to itself, and crane stuff 2024-08-17 16:55:28 +02:00
sliding_crane.prefab.meta Working magnet and crane AI 2024-08-17 16:13:26 +02:00
strip_door.prefab Strip doors 2024-08-18 12:31:25 +02:00
strip_door.prefab.meta Strip doors 2024-08-18 12:31:25 +02:00
strip_doors.prefab Strip doors 2024-08-18 12:31:25 +02:00
strip_doors.prefab.meta Strip doors 2024-08-18 12:31:25 +02:00
Tools.meta Assembling Main scene. 2024-08-18 17:48:35 +02:00
Trash Bin.prefab Assembling Main scene. 2024-08-18 17:48:35 +02:00
Trash Bin.prefab.meta Added more prefabs 2024-08-17 20:38:25 +02:00